Your Partner in Turkish Ports and Straits

ISO 9001:2008 certified

Since 2000

Karden Shipping Agency Inc.Co.

Marmara Ports

Haydarpasa TCDD Port—Istanbul

Karden Shipping Agency

Position

Lat : 41  00’ N      Long : 29  00’ E

Port Management

TCDD Liman İşletmesi Müdürlüğü Haydarpaşa / İstanbul

Phones: +90.216.348 80 20

Fax : +90.216.345 17 05

ISPS

Port Facility : TCDD Liman İşletmesi Müdürlüğü Haydarpaşa / İstanbul

Statement No : 1834088

Level : 1

PFSA date : 31/12/2004

PFSO : Mr.Musa Sirt

Mobile : +90.505.501 42 02

               +90.216.337 06 83

Pilotage

Compulsory. Pilotage services is carried out by Turkish Maritime Organization

Towage

Compulsory for vessels over 2000GRT

3 tugs and 2 mooring boats are availiable

Density

1.014 - 1.016

General Info

The port is handling mainly containerized cargoes. Besides container operaion, port is equipped to handle bulk (grain) and breakbulk cargoes.

The port is protected by a breakwater

 

Berths          Purpose                                 LOA      Draft

No1              Wagon movements                  80 m      4,5 m

No2              General Cargo                       210 m      5-7,5 m

No3              Grain                                      190 m      8-9,5 m

No4-5          General Cargo                      334 m      9 m

No6              General Cargo                       220 m      9,3 m

No7-8          General Cargo                        246 m      9 m

No9              General Cargo                        220 m      7 m

No10            Container                               100 m      7 m

No11            Container                               250 m      10 m

No12            Container                               300 m      11 m

No13-14      Container                               295 m      7-9 m

No15            General Cargo                        220 m      7 m

No16            General Cargo                        160 m      6 m

No17            RoRo Ramp                            141 m      8 m

No18            RoRo Ramp                            164 m      6 m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equipment

· 4 units quayside gantry cranes of 40 tons capacity

· 18 units rubber tired transtainers of 40 tons capacity

· 9 units reach stackers of 25 to 42 tons capacity

· 8 units empty container forklifts of 8 to 10 tons capacity

· 9 units shore and yard cranes of 3 to 35 tons

· 6 units mobile cranes of 5 to 25 tons capacity

· 8 units standart and 30 small masted forklifts

· 1 floating crane of 250mt lifting capacity

Working Hours

24 hours a day in 3 shifts (08:00-16:30, 16:30-00:30, 00:30-08:00) 

Facilities

CNT Land Terminal : There is a container land terminal outside the port (Göztepe) for stacking the empty containers, which  covers an area of 55.000m2 and which the holding capacity is 52.800 TEU.

 

Bulk Cargo facilities : A grain silo belonging to TMO (Turkish Grain Board) of 34.000 tons capacity is available which is equiiped with a conveyor connection with the quay.

 

The Rail Ferry : Rail ferries are operated between Sirkeci and Haydarpasa Train stations. Three rail ferries each of 480 tons capacity are available.

Garbage

Compulsory. Collected by İstanbul Metropoiltan Municipality with cooprdination of port management

Repairs

Minor repairs can be arranged via agent

Storage

Open closed ware houses available

Fresh Water

Availiable fm the quay

Provision

Availiable via agent

Bunkers

Availiable by barge only

Medical Facilities

State and Private Hospitals are available

Airport

The nearest international airport is İstanbul Ataturk Airport with an approx distance of 40km